BP129246 - 5445 Bayshore Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP129246 - 5445 Bayshore Drive | |
---|---|
Neighbourhood: | North Slope |
Street Address: | 5445 Bayshore Drive |
Type of Application: | Single / Two Family Alteration |
File Number: | BP129246 |
Date Application Submitted: | June 28, 2023 |
Application Description: |
Interior renovations including new kitchen over existing garage deck at rear of garage 2023-DEC-19 REVISION: Multiple changes. See approved plans. 2024-SEP-19 REVISION: Interior layout, door and window changes, add 2 exterior doors, change deck floor assembly, increase covered entry size, remove sink from existing make up room to convert to bedroom |
Application Status: | ACTIVE |
Permit Value: | $300,000.00 |
Building Area: |
42.55 M2 458.00 ft2 |
Builder: | R DOLAN CONSTRUCTION LTD |
Issued Date: | September 22, 2023 |
Expiry Date: | September 22, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
5445 BAYSHORE DRIVE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
CANCELLED |
EXCAVATION
Excavation of soil, prior to placing forms. |
PASSED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.