BP129515 - 102-221 Southside Drive (Western Driveline)

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP129515 - 102-221 Southside Drive (Western Driveline)
Neighbourhood: Harewood    
Street Address: 102-221 Southside Drive (Western Driveline)
Type of Application: Commercial / Multi-Res Alteration
File Number: BP129515
Date Application Submitted: August 25, 2023
Application Description: Addition of new 50.73 m2 (546 sf) unconditioned Bay 4 to existing Unit 102 in building. Extension of existing NFPA 13 dry pipe sprinkler system. Bay 4 separate fire compartment from adjacent Bay 3 by 1-hr FRR/FS (45-min required) to u/s of roof sheathing for construction of exposing building face purposes. NW exposing building face of Bay 4 1-hr FRR combustible construction with noncombustible cladding.

Building Classification: 2018 BCBC Part 9 Group F2, one storey, 565 m2 building area, combustible and noncombustible construction, noncombustible cladding, sprinklered without fire alarm. Part 4 steel (Bays 1, 2, 3) and Part 9 wood (Bay 4) structure. Unit 101 (Bays 1 &2): 386.6 m2 (including covered bay), Unit 102 (Bays 3&4): 178.4 m2.
Application Status: ACTIVE
Permit Value: $74,798.00
Building Area: 50.73 M2
546.05 ft2
Builder: LAMINA PLAN/CONSTRUCT
Issued Date: September 20, 2024
Expiry Date: September 20, 2026

Associated Properties

Address Zone More
221 SOUTHSIDE DRIVE I2 Property Report

Process Steps

Task Status
EXCAVATION

Excavation of soil, prior to placing forms

PASSED
EXCAVATION

Excavation of soil, prior to placing forms

CANCELLED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

PASSED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy