BP129640 - 2005 Mountain Vista Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP129640 - 2005 Mountain Vista Drive | |
---|---|
Neighbourhood: | Diver Lake |
Street Address: | 2005 Mountain Vista Drive |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP129640 |
Date Application Submitted: | October 31, 2023 |
Application Description: |
New construction for single-family dwelling with secondary suite 2024-NOV-13 REVISION: Add engineered interior glass guards |
Application Status: | ACTIVE |
Permit Value: | $450,000.00 |
Building Area: |
228.05 M2 2,454.71 ft2 |
Builder: | RTH ENTERPRISES LTD |
Issued Date: | December 22, 2023 |
Expiry Date: | December 22, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
2005 MOUNTAIN VISTA DRIVE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
APPROVAL-ENGINEERING
Approval required prior to Occupancy |
REQUIRED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.