BP129732 - 853 Quilchena Crescent
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP129732 - 853 Quilchena Crescent | |
---|---|
Neighbourhood: | Departure Bay |
Street Address: | 853 Quilchena Crescent |
Type of Application: | Single / Two Family Alteration |
File Number: | BP129732 |
Date Application Submitted: | February 01, 2024 |
Application Description: |
Interior renovations of entire dwelling, including second-floor addition and new secondary suite in basement. 2024-DEC-05 REVISION: Main floor and basement bathroom layout changed, laundry room and powder room layout changed, windows in suite bedroom and bathroom relocated. 2024-MAY-29 REVISION: Revised structural drawings. Geotechnical Engineer and Schedule B added. 2024-AUG-20 REVISION: Interior and exterior revisions including: 1. Lower floor footprint rear increased, increased area in suite as well as main bathroom, laundry room, mudroom entry design change, window and door size and location change. 2. Secondary suite ground floor plan and roof above removed from right side yard and increased in depth at front yard. 3. Upper floor layout change: increased area and layout change at ensuite washroom, window sizes and locations. 4. Second storey balcony reduced in width and new roof at kitchen. |
Application Status: | ACTIVE |
Permit Value: | $200,000.00 |
Builder: | DOWNS CONSTRUCTION LTD |
Issued Date: | March 07, 2024 |
Expiry Date: | March 07, 2026 |
Associated Properties
Address | Zone | More |
---|---|---|
853 QUILCHENA CRESCENT | R5 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
FAILED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
FAILED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.