BP129848 - 2043 Lakeside Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP129848 - 2043 Lakeside Drive | |
---|---|
Neighbourhood: | Chase River |
Street Address: | 2043 Lakeside Drive |
Type of Application: | Single / Two Family Alteration |
File Number: | BP129848 |
Date Application Submitted: | March 13, 2024 |
Application Description: |
Addition to an existing BCBC Part nine SFD. Work includes; Construction of a180 ft2 sitting room; 532ft2 of rear deck; additional garage and storage for main dwelling.Construct 768ft2 secondary suite above the new garage and storage. Plumbing work includes: Installation of 1 Sink; 1 CW; and 1 bathroom group for the suite. 2024-JUL-18: REVISION: Pad footing removed mid-span of beam. Sealed beam document provided. |
Application Status: | ACTIVE |
Permit Value: | $312,871.06 |
Issued Date: | May 13, 2024 |
Expiry Date: | May 13, 2026 |
Associated Properties
Address | Zone | More |
---|---|---|
2043 LAKESIDE DRIVE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
PASSED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
FAILED |
INTERIOR BRACED WALL PANELS
The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound. |
CANCELLED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.