BP129975 - 4856 Finnerty Place
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP129975 - 4856 Finnerty Place | |
---|---|
Neighbourhood: | North Slope |
Street Address: | 4856 Finnerty Place |
Type of Application: | Single / Two Family Alteration |
File Number: | BP129975 |
Date Application Submitted: | April 23, 2024 |
Application Description: |
Two-storey addition to include legal secondary suite. Scope of work includes addition of 9 plumbing fixtures and converting part of an existing garage to new living space with 2 covered porches. 2024-OCT-04 REVISION: Adding 2 windows to upper floor bedrooms, change structural engineer 2024-OCT-31 REVISION: Change bathroom sink in suite to single, add hot water tank beneath stairs with access panel. |
Application Status: | ACTIVE |
Permit Value: | $300,000.00 |
Building Area: |
107.87 M2 1,161.10 ft2 |
Builder: | ECOCRAFT CONSTRUCTION INC |
Issued Date: | June 25, 2024 |
Expiry Date: | June 25, 2026 |
Associated Properties
Address | Zone | More |
---|---|---|
4856 FINNERTY PLACE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
CANCELLED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.