BP129994 - 410 Wentworth Street (Dr. Bruce Senini Dental Clinic)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP129994 - 410 Wentworth Street (Dr. Bruce Senini Dental Clinic) | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 410 Wentworth Street (Dr. Bruce Senini Dental Clinic) |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP129994 |
Date Application Submitted: | April 03, 2024 |
Application Description: |
(Dr. Bruce Senini Dental Clinic) Alteration/repair to fire damaged building. Complete interior renovation on main floor, new partition and loadbearing assembly locations. Accessibility on main floor to BCBC 2024. Existing accessible front entrance ramp, engineered porch repair. Structural design of alterations to CWC (9.4.1.1.(1)(b)) with Part 9 foundations (9.4.4.1.(1)(a)). 2024-OCT-02 REVISION: Add W/D and sink in staff room. Delete two dental sinks. Structural revisions. Existing Building Classification (BP011926): NBC 1975 Part 9 Group D, 202.6m2 building area (including porch), two storeys with basement, combustible construction, unsprinklered, without fire alarm. 45-min FRR/FS floor assemblies. East EBF (Richard St) 1-hr FRR. |
Application Status: | ACTIVE |
Permit Value: | $270,000.00 |
Builder: | KNOX CONTRACTING |
Issued Date: | August 29, 2024 |
Expiry Date: | August 29, 2026 |
Associated Properties
Address | Zone | More |
---|---|---|
410 WENTWORTH STREET | DT8 | Property Report |
Process Steps
Task | Status |
---|---|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.