BP130250 - 702 Fern Ridge Place/ 1025 Palomino Place
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP130250 - 702 Fern Ridge Place/ 1025 Palomino Place | |
---|---|
Neighbourhood: | Westwood |
Street Address: | 702 Fern Ridge Place/ 1025 Palomino Place |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP130250 |
Date Application Submitted: | August 20, 2024 |
Application Description: |
Attached duplex development. Dwelling A GFA is 197.48 m². Dwelling B GFA is 182.90 m². 2025-JAN-09: Energy advisor changed. Add sink in kitchen of Unit B. |
Application Status: | ACTIVE |
Permit Value: | $1,100,000.00 |
Building Area: |
387.67 M2 4,172.84 ft2 |
Builder: | TYCOTT CONTRACTING LTD |
Issued Date: | October 22, 2024 |
Expiry Date: | October 22, 2026 |
Associated Properties
Address | Zone | More |
---|---|---|
702 FERN RIDGE PLACE | R10 | Property Report |
702 FERN RIDGE PLACE | Property Report | |
1025 PALOMINO PLACE | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
CANCELLED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.