BP130267 - 385 Westwood Road (Westwood Lake Park)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP130267 - 385 Westwood Road (Westwood Lake Park) | |
---|---|
Neighbourhood: | Westwood |
Street Address: | 385 Westwood Road (Westwood Lake Park) |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP130267 |
Date Application Submitted: | August 09, 2024 |
Application Description: |
Two new public washroom buildings at Westwood Lake Park. One universal dressing and washroom building with adult change table, with two drinking fountains and one bottle filling station. One individual washroom building with 1-hr FRR/FS electrical room and 6 washrooms, one of which is a universal washroom. All accessibility to CSA B651-18, except bottle filling stations to BCBC 2024 3.8.3.11. No showers (interior or exterior) in scope of permit. Building Classifications: Individual Washroom Building: BCBC 2024 3.2.2.28, Group A2, one storey, 46.3 m2 building area, combustible and noncombustible construction with heavy timber roof, unsprinklered, without fire alarm. 1-hr FRR south EBF with noncombustible cladding. Universal Change Building: BCBC 2024 3.2.2.28, Group A2, one storey, 86.1 m2 building area, combustible and noncombustible construction with heavy timber roof, unsprinklered, without fire alarm. 45-min FRR north EBF. |
Application Status: | ACTIVE |
Permit Value: | $2,100,000.00 |
Issued Date: | December 10, 2024 |
Expiry Date: | December 10, 2026 |
Associated Properties
Address | Zone | More |
---|---|---|
385 WESTWOOD ROAD | R1 | Property Report |
395 WESTWOOD ROAD | PRC2 | Property Report |
399 WESTWOOD ROAD | PRC2 | Property Report |
389 WESTWOOD ROAD | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.