BP130267 - 385 Westwood Road (Westwood Lake Park)

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP130267 - 385 Westwood Road (Westwood Lake Park)
Neighbourhood: Westwood    
Street Address: 385 Westwood Road (Westwood Lake Park)
Type of Application: Commercial / Multi / Industrial
File Number: BP130267
Date Application Submitted: August 09, 2024
Application Description: Two new public washroom buildings at Westwood Lake Park. One universal dressing and washroom building with adult change table, with two drinking fountains and one bottle filling station. One individual washroom building with 1-hr FRR/FS electrical room and 6 washrooms, one of which is a universal washroom. All accessibility to CSA B651-18, except bottle filling stations to BCBC 2024 3.8.3.11. No showers (interior or exterior) in scope of permit.

Building Classifications:
Individual Washroom Building: BCBC 2024 3.2.2.28, Group A2, one storey, 46.3 m2 building area, combustible and noncombustible construction with heavy timber roof, unsprinklered, without fire alarm. 1-hr FRR south EBF with noncombustible cladding.
Universal Change Building: BCBC 2024 3.2.2.28, Group A2, one storey, 86.1 m2 building area, combustible and noncombustible construction with heavy timber roof, unsprinklered, without fire alarm. 45-min FRR north EBF.
Application Status: ACTIVE
Permit Value: $2,100,000.00
Issued Date: December 10, 2024
Expiry Date: December 10, 2026

Associated Properties

Address Zone More
385 WESTWOOD ROAD R1 Property Report
395 WESTWOOD ROAD PRC2 Property Report
399 WESTWOOD ROAD PRC2 Property Report
389 WESTWOOD ROAD R5 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
STORM CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.