BP130410 - 90 Kerr Street

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP130410 - 90 Kerr Street
Neighbourhood: University District    
Street Address: 90 Kerr Street
Type of Application: Single / Two Family Alteration
File Number: BP130410
Date Application Submitted: November 21, 2024
Application Description: Interior alterations, including new lower-floor bedroom with ensuite, washer/dryer in existing lower bathroom and converting carport to garage with deck above

REVISION: MAR.18,2025: Added Geotechnical Engineer's schedule b for bearing
Application Status: ACTIVE
Permit Value: $150,000.00
Building Area: 93.08 M2
1,001.90 ft2
Issued Date: January 07, 2025
Expiry Date: January 07, 2027

Associated Properties

Address Zone More
90 KERR STREET R14 Property Report

Process Steps

Task Status
EXCAVATION

Excavation of soil, prior to placing forms.

CANCELLED
EXCAVATION

Excavation of soil, prior to placing forms.

PASSED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

FAILED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PASSED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

FAILED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

PASSED
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
INTERIOR BRACED WALL PANELS

The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound.

FAILED
INTERIOR BRACED WALL PANELS

The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound.

PARTIAL
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.